+359 887 670 211
"Repair Works on Main and Auxiliary Equipment and Systems of 5 and 6 NPP Units - Planned Annual Repairs in 2022" at Kozloduy NPP.
- Main Contractor
"Repair Works on Main and Auxiliary Equipment and Systems of 5 and 6 NPP Units - Planned Annual Repairs in 2023" at Kozloduy NPP.
- Subcontractor
"Replacement of Main Pipeline Sections of Kozloduy District Heating System with Three Sub-sites"
1. A Section of the Northern Highway from 13A-5 K to 13A-6 K
2. A Section of the South Highway from 16-6 K to 16-8K
3. A Section of the Third Main Highway from 18 K to 21 K and 20-1 K
- Main Contractor
“Construction of a Hydro discharging of Ion Exchange Resins System from Filters of SVO-5 in SC-3. Work Plan EQEB-11730-R02 - IP item 2.2048.1” – Kozloduy NPP Investment Program
- Subcontractor